TRACKING SPECIALIST — BARIS ASA · LONDON
Synctag
Start the check → TRACKING SPECIALIST — BARIS ASA · LONDON

READING ROOM › SYMPTOM FILES › SYM-076

SYMPTOM FILE SYM-076 FILED 14 NOV 2026 · REVISED 14 NOV 2026

Consent Mode v2 modelled conversions: why Google Ads isn't showing any.

ALSO FILED AS
  • “consent mode modelled conversions not showing in Google Ads”
  • “where are modelled conversions in Google Ads”
  • “consent mode modeling not active”
  • “Google Ads consent mode uplift missing”
  • “consent mode is implemented but modeling is not active”
  • “how long do modelled conversions take Google Ads”

Baris Asa, tracking consultant, London · Last checked: November 2026

Nothing is necessarily broken. Modelled conversions sit inside the Conversions column, not beside it, so there is no separate column to find. Open the conversion action’s Diagnostics tab instead. If it says “Consent mode is implemented”, you are either too early or below Google’s volume threshold of 700 ad clicks over 7 days per domain and country.

“Not showing” means one of three things: modelling hasn’t started, it started but the number is small, or the wiring never gave it a signal. Find yours:

What Diagnostics showsMost likelyDo this
”Consent mode is implemented”Too early, or under the volume thresholdCount days and clicks, below
”Modeling is active”, no uplift tableUplift under 1 per cent, window over, or thin dataRead the uplift notes below
No status after 2 weeksWiringRun the Tag Assistant checks

This note sorts them in that order. It does not repeat the basic versus advanced decision (that is its own note) or how large a drop is normal (that one is here).

Where do you actually look?

Not in a report column. In Google Ads: Goals, Conversions, Summary. Open a website conversion action, then its Diagnostics tab (Verify consent mode is implemented). Google gives two status messages there:

Status in DiagnosticsWhat Google says it means
Consent mode is implementedConsent mode is live, but the modelling thresholds are not met yet
Consent mode is implemented and modeling is activeModelling is running

Once modelling is live, the tab also lists uplift per domain and country with a modelling start date. Google defines uplift as modelled conversions divided by observed conversions, refreshes it weekly, and shows it for 4 weeks after the start date (About consent mode impact results). The “modeling is active” status stays after the table disappears.

Two reading traps. Uplift under 1 per cent is not shown, so a quiet table is not always a broken one. Google reports modelled and observed conversions together, so you can’t split them in the Conversions column. Use the uplift table, or compare before and after (About modeled online conversions).

Is it just too soon?

Check this first. It costs nothing.

  • Consent mode must have run for at least 7 full days before impact results can appear (Troubleshoot consent mode).
  • Modelling then trains. Google gives no number of days for training, only that modelled conversions flow in gradually (About consent mode modelling).
  • The Diagnostics status can take 48 hours to appear, and Google says up to 2 weeks in certain cases. If Tag Assistant shows the set-up working, Google’s guidance is to put a missing status down to that delay.
  • Modelled conversions take up to 5 days to settle in reporting, so last week’s figures move.

If it has been under two weeks and Tag Assistant is clean, I would leave the set-up alone so you read one clean result.

Are you big enough?

Modelling needs 700 ad clicks over 7 days per domain and country grouping. That is the per-country, per-domain floor, not the account total. Illustration, not a case: 2,000 clicks in 7 days over six countries is about 333 each, under 700 in all six. An uneven split could clear one. Below it, Diagnostics keeps saying “Consent mode is implemented”, and wiring is not the first suspect. If clicks are under 700 per country and domain over 7 days, volume is the likely blocker. If you are above 700 and still see “implemented”, go to the wiring checks.

Does modelling have anything to work from?

If the thresholds are met and 7 days have passed but your largest countries show no uplift, Google says to suspect the implementation (About consent mode impact results). Your developer or consent platform vendor fixes these; you can prove them yourself with Tag Assistant, Google’s debugging tool.

  1. Default set too late. Google’s guidance: the default consent state must be set before any tag or other code uses or updates consent. A default that loads after the tags means early hits leave with no state.
  2. Defaults missing for some signals. Set ad_storage, ad_user_data, analytics_storage and ad_personalization. The Consent tab in Tag Assistant is empty when consent mode isn’t on the page or the Google tag was blocked (Troubleshoot consent mode).
  3. Pages you didn’t test. Google’s debugging guide has you run Tag Assistant on the site; run it on checkout and the order confirmation page too, not just the homepage. In my audits, checkout is the template most often missing the default. That is an observation, not a Google statement. Filed under F-201 .
  4. Nothing sent while denied. In advanced mode the tags send cookieless pings while consent is denied; in basic mode nothing is sent until the visitor accepts. Load the site from the UK, leave the banner alone, and check in Tag Assistant which you have. The difference is the basic versus advanced question.

Test sequence in Tag Assistant: default denied on load, update to granted after you accept, tags firing or blocked to match (Troubleshoot consent mode). Seen it more than once: a correct banner, a late default, and an account that never leaves “implemented”.

Are these conversions the kind that get modelled?

Test: do your Ads conversions come from a GA4 import? Then check before reading Diagnostics.

Google’s modelling pages describe website tag conversions, and name the Google tag, consent mode and Enhanced Conversions as the ways to improve them (About modeled online conversions). They don’t say imported GA4 conversions receive consent mode modelling in Google Ads, and they warn that offline imports may not include certain types of modelling. GA4 has its own behavioural modelling with its own thresholds (at least 1,000 events a day with analytics storage denied for 7 days, and 1,000 consented daily users on at least 7 of the previous 28 days, with no guarantee of eligibility), set out in Google’s GA4 documentation; don’t assume one carries over to the other. A broken import is a different fault: F-403 , Google Ads not receiving GA4 conversions at all.

Enhanced Conversions supplies more observed data to improve measurement and modelling. It is not a substitute for consent. Recovery for the accepted slice is F-402 .

What to do, in order

  1. Confirm consent mode has run 7 full days. If not, stop here and wait.
  2. Open Diagnostics on a website conversion action. Note which of the two statuses you see.
  3. “Implemented” only: check ad clicks per domain and country against 700 over 7 days.
  4. Thresholds met, no uplift in your biggest countries: run the four wiring checks above.
  5. Past 2 weeks with a clean Tag Assistant and still no status: take the Diagnostics screenshot and the Tag Assistant result to whoever owns your consent platform or GTM container. If they don’t settle it, a tracking audit reads the screenshot and the container together and tells you which of the three it is.

Orders still down against the store after all that? Start with the conversion drop note. To prove the wiring on a live site, use how to check Consent Mode v2 is working.

Sources

Google Ads Help: Verify consent mode is implemented (menu path, two statuses, 48 hours and up to 2 weeks), About consent mode impact results (uplift, 4 weeks, 1 per cent), About consent mode modelling (700 clicks, Conversions column), About modeled online conversions (up to 5 days, imports), Troubleshoot consent mode. Google developers: Troubleshoot consent mode.

← back to the reading room